The right sequence for window surveying
- Define the position and installation situation unambiguously.
- Measure width at top, middle and bottom.
- Measure height at left, middle and right.
- Add reveal, meeting rail, junction details and any special conditions.
- Take photos and mark critical points.
- Check data on site before exporting or ordering.
Dimensions you should not forget
Clear opening dimensions
Width and height at several points so taper, slopes and tolerances become visible.
Reveal and junction
Depth, meeting rails, junction joints, existing boxes or adjacent components.
Extra information
Opening type, special conditions, material state and images help downstream office work.
Plausibility check
Before finishing, check that all fields are complete and values are consistent.
Short on-site checklist
- • Create or prepare job and position in advance
- • Capture several measuring points per opening
- • Note special cases directly in the dataset
- • Take photos clearly tied to the position
- • Clarify queries and open points on site, not only back at the office